English
PLATFORM HEIGHT 1.50 METRE
Erect the Safety Cage as described on pages 9 to 11.
1.
Refer to the diagrams on page 21.
Place your foot on RUNG 9 and lift RUNG 5 on the LEFT frame until locked.
2.
Place your foot on RUNG 9 and lift RUNG 5 on the RIGHT frame until locked.
3.
Place your foot on RUNG 9 and lift RUNG 6 on the RIGHT frame until locked.
4.
Place your foot on RUNG 9 and lift RUNG 6 on the LEFT frame until locked.
5.
Attach the Platform to RUNG 3 as described on pages 12 and 13.
6.
See 'Deploying the Platform Stabilisers' described on pages 15 and 16.
7.
Extend and lock a platform stabiliser above the rung containing the
until
BLUE
shows in the viewing window in the stabiliser. Ensure it is locked.
Place the stabiliser hook over the
8.
place.
Repeat steps (7) and (8) for the other platform stabilisers.
9.
Fit the Toe boards as described on page 14.
10.
Deploy the ground-stabiliser legs as described on page 8.
11.
20
BLUE
bracket and push down to lock it in
5
Platform Height
Lift this rung then rung 6
RUNG
BLUE
1.50m
bracket