Installation Preparation; Product Dimensions; Installation Clearances; Cabinet Preparation - GE UVC9300 Manual Del Propietario E Instalación

Ocultar thumbs Ver también para UVC9300:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PRODUCT DIMENSIONS

Design varies by model
12"
1-15/16"
28-1/4" or
34-1/4"

CABINET PREPARATION

FRONT VIEW
1"
SIDE VIEW
10

Installation Preparation

18" or 24"
3-1/8"
9"
4-1/4"
19-1/8"
18-1/2" min.
11-1/2"
1"
29" min.
11-1/2"
3"
1"

INSTALLATION CLEARANCES

This vent hood must be installed between the 24"
required minimum and 36" recommended maximum
above the cooking surface.
instructions for product-specific clearances.
NOTE: Installation height should be measured
6-15/16"
from the cooking surface to the bottom edge of the
cabinet surface.
NOTE: UL requires any combustible surface to be a
minimum of 30" above the cooking surface. Lower
11-1/2"
combustible surfaces may be covered to meet
requirements.
18-1/2" minimum for vertical venting and 29"
minimum for recirculation.
can be installed for recirculating operation. For
recirculating operation, refer to Recirculating
Installation Planning.
installed over an island.
18-1/2" min.
NOTE: The exhaust duct on the hood is closer to
the rear of the hood. It is important to plan for the
alignment to the connection point of the hood.
11-1/2"
*24" Minimum required
*36" Maximum recommended
Typically 36"
6-1/2"
49-80813-2

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Uvc9360

Tabla de contenido