Start-Up Procedure; Shutdown Procedure - Stryker T/PUMP Serie Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

START-UP PROCEDURE

WARNING
• Pump must be filled with water prior to operation.
• To avoid the risk of shock, unplug the unit before filling the reservoir.
1.
Before filling the pump, attach a pad to the connector hose. Make sure that
there are no kinks in the hose or pad. Open the hose clamps.
2.
Open the fill cap on top of the pump.
3.
To fill for cooling:
a. Fill with cold water to the Cooling water line.
b. Fill with ice to the full capacity of the reservoir.
4.
To fill for heating, fill with room temperature
water to the Heating water line.
5.
Plug the T/Pump into a properly grounded Hospital Grade receptacle.
6.
Press the On/Standby button. The light next to the selected temperature begins to flash.
7.
Use the keypad to set the temperature as directed by the prescriber. For the TP700 only, after setting the
temperature, press and hold the lock Temperature Setpoint button for 2 seconds to lock the setpoint.
Note: If you toggle past the desired setpoint, keep toggling to start at the beginning of
the setpoint column. The selected water temperature will be reached in approximately
15 minutes and the light next to the selected temperature becomes steady.
8.
Check the water level. If it drops below the operating level, add water.
9.
Apply the Mul•T•Pad to the patient as prescribed. Follow the Mul•T•Pad instructions.
10. Position the pump at or above the level of the pad.
Note: If the pump is placed below the pad(s), water will drain into the pump when it is shut off. If
the pump has been overfilled or if multiple pads are connected, excess water can leak.
11. When using for cooling, the ice will eventually melt and the setpoint will start flashing. Press on/
standby button so the standby light is lit. Unplug pump from power receptacle. Open fill cap and
invert pump over sink to drain water. Refer back to step #3 and follow through procedure.

SHUTDOWN PROCEDURE

1.
Press the On/Standby button so that the Standby light is lit.
2.
Unplug the T/Pump.
3.
Close all hose clamps.
4.
Disconnect pad(s) from pump.
Note: To prevent water spillage, always disconnect pad from pump with connectors raised above the level of the
pad and pump.
5.
Coil the hose, and attach the Clik-Tite
applicable.
6.
Secure the hose to the T/Pump using the tube set strap.
7.
Wrap the power cord around the unit.
www.stryker.com
Operating Instructions
connectors together on the hose (See Figure 5,
®
101515 REV C
page
1-11), where
1-13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

T/pump tp600T/pump tp700

Tabla de contenido