System Of Bath Tilting - Lotus BR 50-78 ET Instrucciones Para La Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

System of bath tilting

For manual tilting follow the instructions bellow:
1) Under overflow put suitable and heatproof container
2) Make sure, that you let cool down content after frying
3) On the control wheel, tilt manipulating handle
4) for lifting up and draining, circle with control wheel to right, to bring the bath back into operation
position, circle with control wheel to left
5) Try to do lifting up and draining of the bath as smooth as possible to avoid excess vibrating of
the bath
Never pour oil off the bath at frying temperature. Keep maximum attention while manipulating the bath and
its content, some components of the bath could be very hot even the content was cooled.
10

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido