Kit List; Technical Data; Installation; Assembly - Gruppo Ferroli FZ4B Instrucciones De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

CONTROLLO ZONE FZ4B

KIT LIST

Q.
Description
Board FZ4B
1
NTC probe L=2500mm
2
Bag for screws
1
Cable clamp
6
Phillips self-tapping screw 3.5x19
12
UNI6954
Plugs D.5x25
2 x 2
Flathead screw 4x30
2 x 2
Instruction manualFZ4B
1
Card SKI6504
1

2. INSTALLATION

2.1 ASSEMBLY

Attention!
Before opening the enclosure, always make sure the mains voltage is disconnected.
Assembly must be carried out only in a closed and dry place. To ensure proper operation, make there are no strong electromagnetic fi elds in the place of installation. The
controller must be separated from the power mains by means of a supplementary device (with a disconnection distance of at least 3 mm on all poles), or a disconnecting
device complying with the regulations. During installation make sure the power supply connection cable and the probe cables remain separated.
2.2 INSTALLATION
Before installation, remove the front part of the box, prising with a
screwdriver at point 1 (fi g.3); then lift the front part of the box as
indicated in point 2 (fi g.3):
fi g. 3
66

TECHNICAL DATA

Room temp.
Operation: -10°c ÷ +60°c
Storage and transport -25°C ÷ +80°C
Max. room humidity 90% at 40°C
Installation:
Wall
Power supply range:
230Vac +10% -15%, 50Hz
Total current absorbed:
5VA @ 230Vac (no load)
230Vac output characteristics:
Output relay nominal current = 5A@250Vac (max. permissible load: 1A 230Vac cos φ 0.7)
Fuse characteristics:
2 x 250Vac 2A fast 5x20
Fix the back of the zone control (fi g.4) to the wall with the set of screws supplied.
Carry out the wiring according to the diagrams given in the following section. Close everything,
repeating the previous steps in reverse order.
fi g. 4
EN

Publicidad

Tabla de contenido
loading

Productos relacionados para Gruppo Ferroli FZ4B

Tabla de contenido