1.
General Information
1.1
Principles: Planning, Implementation, Maintenance and Repair
Planning
Expert draws up a draft.
•
Geological survey.
•
Layout adapted to current situation.
•
Basic assessment taken into account:
•
Number of inhabitants
Implementation
The work is to be carried out by a specialist in compliance with all applicable standards and regu-
•
lations.
Maintenance and Repair
Maintaining an efficient, optimized system over a long period of time requires proper maintenance
•
and repair work.
The Operator is responsible for maintenance and repair work.
•
1. General Information
6
12
Nominal daily amount of sewage
3
0.90 m
/day
3
1.8 m
/day
35 / 96