Nussbaum POWER LIFT HF 3S 3000 Instrucciones De Servicio página 93

Ocultar thumbs Ver también para POWER LIFT HF 3S 3000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

damage (hairline cracks, cracks or similar), or if the
required torque cannot be applied then the set up
location is unsuitable.
1
2
4
3
Figure 21: General assembly view without riser extension
1 Cross-beam
2 Operating column
3 Long lifting arm
4 Operating unit
A foundation must be made according to the
„Foundation plan" sheet regulations. Also a level, set
up surface must be ensured for the lift so there is con-
tinuous contact between the lift and the concrete
floor.
Figure 22: Anchoring
1 Column
2 Base plate
3 Safety anchor
• To reach a higher level of protection against hu-
midity from the workshop floor, a thin PE foil should
be put between the workshop floor and column
OPI-POWER LIFT HF 3S 3000-4000 - HYMAX HF 3S 3000-4000 -V1.1-DE-EN-FR-ES-IT
5
6
7
5 Riser
6 Counter column
7 Short lifting arm
base plate before anchors are placed. Also, the
gap between the base plate and workshop floor
should be silicone sprayed after anchoring.
• Lift the cross-beam that is fastened to a column
and fasten to the opposite side. Hydraulic lines
are marked in colours thereby making them easy
to connect.
• Holes for floor anchoring are to be placed through
the holes in the base plates.
Clean the bore holes by blowing them out with
air. Insert safety anchors into the holes.
The manufacturer recommends e.g. Hilt injection
anchors or similar anchors from other manufac-
turers, with approval and in compliance with their
specifications.
Before anchoring the lift, check whether the con-
crete is of quality C20/25 up to the finishing level
of the completed floor. In this case, determine
the anchor length from the "Selection of anchor
length without floor covering (in appendix) data
sheet. If there is a floor covering (tiles, screed) on
the weight bearing concrete, the thickness of this
covering must be determined. Afterwards, then
determine the anchor length from the "Selection
of anchor length without floor covering (in ap-
pendix) data sheet.
• Position and align the lift and lift columns using a
bubble level.
• The base plates are also to be supported with suit-
able underlays (thin metal strips) to ensure precise
vertical set up and contact between the base
plate and the floor.
• Tighten the anchors using a torque wrench.
Each anchor must be able to be tightened to
!
the torque specified by the manufacturer. Safe
operation of the lift is not guaranteed with a low-
er torque.
• If an anchor is tightened to the specified torque,
then the domed washer lays flat on the base plate.
Secure anchor connection is then guaranteed.
93

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Power lift hf 3s 3500Power lift hf 3s 4000Hymax hf 3s 3000Hymax hf 3s 3500Hymax hf 3s 4000

Tabla de contenido