Final Considerations - Work Pro BlueLine Digital M Guía Rápida

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FINAL CONSIDERATIONS

- Multiple receivers can choose the same channel reception.
- Channel selection is done by default since SOURCE SELECTOR switch.
The device wil expect OSC commands or from the remote BLC 1 for a possible change of
source and it will make the change according to the last order.
- If 2 streamers are configured on the same channel, the output will be inaudible. Check the
installation and correct the selection.
- REMOTE connection is exclusively for connecting the wallmount control BLC 1. Do not connect
this jack to the LAN.
- For connection to the webserver of each unit, we recommend using Google Chrome.
- At the time of naming the units in the webserver, it is advisable to perform this process
individually in order to locate each device easily.
- The state of the GPI / GPO will be reflected in both directions. Activation of GPI 1 in the
BLS 2M, will make ALL GPO 1 receptors remain activated. This activation status will remain as
long as the activation of the GPI.
- Connection ALARM in BLS 2M, when their contacts are closed, ALL GPO 1 in all receivers
will close too.
- Be aware of the minimum load @ 4 at amplified outputs in BLR 2A
BlueLine System
INSTALLATION
ü
- 10 -
Quick Reference / Guía rápida
WORKCAD
Download this software for the next
link in our website:
link
http://www.equipson.es/prodDetail.asp?idproducto=1851
With this software it is posible to check
the connection state of each device
(IPs, SubNet, etc,), to change the IP
and UPDATE the firmware.
.
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido