38
OPERATING INSTRUCTIONS – INTELLISYS OPTION
LEGEND
2RPS
Switch, fan pressure (option)
RS1
Switch, remote start (option)
RS2
Switch, remote stop (option)
1S
Contactor, star
1Sa, b
Contact, aux. star contactor
1SV
Valve, solenoid (load) N.C.
3SV
Valve, solenoid (blowdown) N.O.
5SV
Valve, solenoid (modulation option)
6SV
Valve, solenoid (modulation option)
10SV
Valve, solenoid (line/sump)
Barrier terminal strip
BLK
Black
BLU
Blue
GRN
Green
RED
Red
WHI
White
SSR UP6 40, SSR UP6 50PE, SSR UP6 50PEI, HF50–PE,
EP50–PE, HP50–PE, HXP50–PE
NOTES
1.
Approved fused disconnect or circuit breaker per N.E.C.
requirements must be provided by customer.
2.
Dashed lines represent wiring by customer.
3.
Sizing of electrical components not supplied by Ingersoll Rand is
the responsibility of the customer and should be done in
accordance with the information on the compressor data plate
N.E.C. and local electrical codes.
4..
When changing the supply voltage, ensure that:
a) The motor and the transformer are rewired for the new voltage
b) The motor overload is adjusted to the proper setting.
5.
Blue wire – 16volts A.C.
6.
Verify actual motor connections with motor schematic.