Maytag Commercial W10045641B Instrucciones De Instalación página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STACKED WASHER/GAS DRYER INSTALLATION
Stacked Washer/Gas Dryer Electrical Requirements
IMPORTANT: The washer/dryer must be electrically grounded
in accordance with local codes and ordinances or, in the
absence of local codes, with the National Electrical Code,
ANSI/NFPA 70, latest edition, or Canadian Electrical Code, CSA
C22.1. If codes permit and a separate ground wire is used, it is
recommended that a qualified electrical installer determine
that the ground path is adequate.
A copy of the above code standards can be obtained from:
National Fire Protection Association
One Batterymarch Park, Quincy, MA 02269
CSA International
8501 East Pleasant Valley Road
Cleveland, Ohio 44131-5575
n Do not ground to a gas pipe.
n Do not have a fuse in the neutral or ground circuit.
n A 120 volt, 60 Hz, AC only, 15- or 20-amp, fused electrical
circuit is required. A time-delay fuse or circuit breaker is also
recommended. It is recommended that a separate circuit
serving only this washer/dryer be provided.
n This washer/dryer is equipped with a power supply cord
having a 3-prong grounding plug.
n To minimize the possibility of shock, the cord must be
plugged into a mating, 3 prong, grounding-type outlet,
grounded in accordance with local codes and ordinances.
If a mating outlet is not available, it is the personal
responsibility and obligation of the customer to have the
properly grounded outlet installed by a qualified electrician.
n If codes permit and a separate ground wire is used, it is
recommended that a qualified electrician determine that the
ground path is adequate.
n Check with a qualified electrician if you are not sure the
washer/dryer is properly grounded.
REQUIREMENTS
Stacked Washer/Gas Dryer Grounding
9

Publicidad

Tabla de contenido
loading

Tabla de contenido