Chain Transport Guard
Bar Retaining
Oil Tank Cap
Guide Bar
Nose
_Saw
Chain
q: Rook
Guard
Craftsman
Convertible
TM
Coupler
Extension Boom
Hanger_
Oil Adjustment
Screw
A e%n
Screw
Oil Reservoir
FILLING THE OIL RESERVOIR
_hb
i DANGER:
Failure to fill the oil reservoir will cause irreparable I
damage to the unit. Make sure the oil reservoir is always filled.
Follow the following steps to fill the oil reservoir:
1. Place the unit on a flat surface.
2. Remove the Oil Tank Cap.
3. Open the bar & chain oil bottle provided with your unit.
4. Pour oil into the reservoir until filled.
NOTE:
The oil reservoir may be filled to the lip of the fill opening
without damaging the unit.
_hb
i WARNING:
Oil constantly flows from the oil reservoir to oil
I
the chain. Check the oil level constantly so that the oil level does
not drop below half full.
INSTALLING/REMOVING
ATTACHMENT
_lk
i WARNING:
Prior to operation, read and understand the I
operator's manual for unit to be used with this attachment.
The attachment
may be mounted to different power tools.
The
instruction
manuals for the basic power tool and the attachment
contain the information necessary for operation of the power tool
combination.
Therefore, aways read BOTH instruction
manuals
before using the power tool for the first time.
Keep the manuals in
a safe place for future reference.
NOTE:
To make installing or removing the attachment
easier, place
the unit on the ground or on a work bench.
Removing the Attachment
or Extension
Boom
WARNING:
To avoid serious personal injury and
damage to the unit, shut the unit off before removing or
installing add-ons.
1. Turn the knob
Convertible
TM
Release Button
counterclockwise
to
Coupler _
/
loosen (Fig. 3).
,
_
_€"=r
2. Press and hold the release
button (Fig. 1).
3. While firmly holding the
upper shaft housing, pull
the attachment
or
extension boom out of the
coupler (Fig. 2).
Guide Recess
Installing
the Attachment
or
Fig. 1
Extension
Boom
_lb
I WARNING:
To avoid serious personal injury and damage
to the unit, NEVER install more than one extension boom to a
power tool.
1. Remove the hanger or
Primary Hole
shipping cap from the top __
of the shaft housing.
2. Turn knob
counterclockwise
to
loosen (Fig. 3).
,,
3.
While firmly holding the
attachment,
push it
Upper Shaft
Lower Shaft
straight into the
Housing
Housing
Convertible
TM
coupler
Fig. 2
until the release button
snaps firmly into the
primary hole (Fig. 6).
NOTE:
Aligning the release
button with the guide
recess will help
installation (Fig. 1).
4. Turn the knob clockwise to
tighten (Fig. 3).
Knob
5. Repeat steps 1-4 for the
attachment
or extension
Fig. 3
boom.
The attachment
should be installed with the release button in the
primary hole.
_l
AUTION:
Lock the release button in the primary hole
and securely tighten the knob before operating this unit.
_l
CAUTION:
Add-ons are to be used in the primary hole
only. Using the wrong hole could lead to personal injury or
damage to the unit.
Check Flex Shaft Engagement Prior to Using
1. Start the unit.
2. Briefly engage and release the trigger.
3. Check that attachment
is operating.
4. If the attachment
is not operating, remove attachment
and
repeat steps for installing the attachment.
5. Recheck operation of the attachment.