Rapid Shutdown Box – Single
Optional: Connecting the Grounding to a Ground Lug
1
1
1
1
Connecting the
IMPORTANT! Wiring schemes show best practice examples assuming that more than two
Rapid Shutdown
PV strings connected in parallel require overcurrent protection (e.g. fusing). Refer to Primo
Box to a Fronius
installation manual regarding multi conductor wiring and fusing details
Primo 10.0 / 11.4 /
12.5 / 15.0
20
Rapid Shutdown Box – Multi
2
2
2
2