Preparatory Measures; Installation In A Pocket; Power Supply; Battery - Diehl Metering Sharky 775 Instrucciones De Montaje

Ocultar thumbs Ver también para Sharky 775:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparatory measures

ƒ
Close the ball valve.
ƒ
Unscrew the plug screw from the ball valve.
Installation (see fig. II)
1. Place the O-ring from the attached coupling set (type A or B) on the
mounting pin.
2. Insert the O-ring with the mounting pin into the sensor hole of the ball
valve (turn the mounting pin).
3. Position the O-ring in its final position using the other end of the
mounting pin.
4. Fastening screws
ƒ
Type A (plastic) - put the fastening screw onto the temperature sen-
sor.
ƒ
Type B (brass) - slide the fastening screw onto the temperature sen-
sor and attach the fastening screw with the dowel pin. Press in the
dowel pin completely and remove the mounting pin from the temper-
ature sensor.
5. Insert the temperature sensor with adapter fitting into the ball valve
and tighten fastening screw by hand (2-3 Nm).

4.2 Installation in a pocket

In case of new installations, temperature sensors for nominal sizes DN25
or smaller should only be installed immersed.
This ensures higher measuring accuracy.
5.

Power supply

5.1 Battery

A 3.6 VDC lithium battery is fitted in the standard version.
ƒ
The battery must not be recharged or short-circuited.
ƒ
Ambient temperatures below 35 °C have a positive effect on battery
lifetime.
Used batteries must be disposed of at suitable waste collection
points! Caution: Risk of explosion if battery is replaced by an
incorrect type.
-24-
English

Publicidad

Tabla de contenido
loading

Tabla de contenido