HIKOKI NV 50AH Instrucciones De Manejo página 4

Clavadora para coils
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42
English
NAIL SELECTION
Choose a suitable nail from Fig. Nails which are not
shown in Fig. can not be driven with this tool. Nails are
linked and rolled.
Min.
4.6 mm
(.181")
1.8 mm
(.071")
Dimensions of nails
STANDARD ACCESSORIES
(1) Eye protector .............................................................. 1
(2) Hexagon bar wrench for M4 screw ........................... 1
(3) Hexagon bar wrench for M5 screw ........................... 1
(4) Hexagon bar wrench for M6 screw ........................... 1
(5) Oiler ............................................................................. 1
(6) Case ............................................................................. 1
OPTIONAL ACCESSORY
Sequential Fire Parts Set (Code No.881-012)
With the sequential fire parts,the nail is driven only
by squeezing the trigger after pushing down the
push lever.
By installing these parts, driving nails into improper
positions and unexpected firing of nails caused by
accidental operation of the push lever can be pre-
vented.
APPLICATIONS
Construction work such as wall sheathing, roof deck-
ing, subflooring.
Mobile and modular home construction.
PREPARATION PRIOR TO OPERATION
1. Prepare the hose
Be sure to use the hose provided with minimum
6 mm (1/4") inside diameter.
NOTE:
The air supply hoses must have a minimum working
pressure rating of 12.8 bar (180 psi) or 150 percent of
the maximum pressure produced in the air supply
system, whichever is higher.
3
Nail
Max.
4.8 mm
(.189")
2.3 mm
(.091")
2. Check on safety
CAUTIONS:
Unauthorized persons (including children) must be
kept away from the equipment.
Wear eye protector.
Check the retaining screws which fix the exhaust
cover, etc. for tightness.
Check the nailer for air leaks and defective or rusty
parts.
Check whether or not the push lever works correctly.
Also check whether or not any dirt has adhered to the
moving parts of the push lever.
Recheck on operational safety.
BEFORE USE
1. Check the air pressure
CAUTION:
The air pressure must be constantly maintained at 4.9
– 8.3 bar (70 – 120 psi.).
Adjust the air pressure between 4.9 to 8.3 bar (70 – 120
psi.) according to the diameters and length of nails
and hardness of the wood being nailed. Pay special
attention to the output pressure, capacity, and piping
on the air compressor, so that air pressure does not
exceed the specified limit. Note that excessive pres-
sure may affect overall performance, service life, and
safety.
2. Lubrication
(1) Prior to operating this nailer, be sure to provide an air
set between the air compressor and this device. Lubri-
cation through the air set offers smooth operation,
extended service life, and anticorrosion.
Adjust the oiler so that a single drop of oil is supplied
at intervals of 5 to 10 nailing cycles.
(2) It is recommended using the recommended oil (SHELL
TONNA). Other applicable oils are listed. Never mix
two or more types of different oils.
3. Loading nails
(1) Load nails in the magazine
Grip the nail guide and knob with fingers. Then
depress the knob to open the nail guide towards
the left. (See Fig. 1.)
Knob
Nail Guide
Fig. 1

Publicidad

Tabla de contenido
loading

Tabla de contenido