USE PROCEDURE
Controller Startup
To startup the controller plug the power cable into a
suitable power source.
Starting the Pump
To start the pump press the START pushbutton on the
controller front panel.
Controller 969-9436- and 969-9536 Rear Panel
47
1. Logic
input
signals
supplied with link).
2. Logic output signals connector and pump current monitor.
3. Power output connector (24 Vdc for pump cooling fan).
4. Pump cord.
5. Controller power entry module consisting of mains fuses,
voltage change over, mains socket and EMC filter.
6. Power output connector (120 Vac) for vent device,
forepump contactor coils, etc.
7. Provision for RS232 communication port connector
(provided as an option).
Pump Shutdown
To shutdown the pump press the STOP pushbutton on
the controller front panel.
MAINTENANCE
The Turbo-V 150 series controller does not require any
maintenance. Any work performed on the controller
must be carried out by authorized personnel.
INSTRUCTIONS FOR USE
connectors
(mating
connector
87-900-907-01 (B)