3.2.
Final installation
3.2.1. Positioning of the tank
The tank must be placed shock-proof and with adequate
equipment into the prepared building pit. After placing the
tank, it must be positioned in the pit in such a way that the
inlet is aligned along the axis of the inlet line. The tank should
be positioned vertically. Make sure the outlet of the separator
is placed 7cm deeper than the inlet. After positioning the
tank, fill the pit layer by layer according to section Fehler!
Verweisquelle konnte nicht gefunden werden..
3.2.2.
Filling in the building pit
In order to avoid deformations of the tanks, the filling of the tank
and the filling of the building pit should be carried out
simultaneously. Before filling the tank encasement, the outlet
bend is filled with water (otherwise it poses
and damaging assembly components!), then the tank will be
filled up to 1/3; then the encasement is filled with layers of a
maximum of 30 cm (grounded gravels with a maximum grain
size of 8/16) up to the tank's upper edge. The individual layers
must be compacted well (manual compactor). In order to
prevent damage to the tank, the use of mechanical compacting
equipment is not permitted at any time. The encasement must
be at least 500 mm wide.
Attention: In order to be suitable for truck traffic (SLW40), a
geotextile must be horizontally installed around the clearance
areas!
Saphir tank series
Geotextil
500
3. Assembly and Installation
1/3
300
Dimensions geotextile
1150 x 1150 mm
KLsepa.compact
a risk of floating
Diamant tank series
Geotextil
30 cm
30 cm
30 cm
1/3
Dimensions geotextile
NS6-1300, NS 10-1300: 1150 x 1150 mm
NS10-4000, NS 15-4000: 1400 x 2450 mm
28