Indoor Unit Installation - Mitsubishi Electric MFZ-KJ25VE Manual De Instalación

Ocultar thumbs Ver también para MFZ-KJ25VE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 30
2. INDooR uNIT INSTallaTIoN
2-1. FIXING oF INDooR uNIT MouNTING BRaCKET
• Find a structural material (such as a stud) in the wall and fix bracket (7) horizontally with fixing screws (8).
• To prevent bracket (7) from vibrating, be sure to install the fixing screws in the holes indicated in the illustration. For added support, fixing screws may
also be installed in other holes.
2-2. HolE DRIllING
1) Determine the wall hole position.
2) Drill a dia. 65 mm hole (dia. 75 mm for KJ50). The outdoor side
should be 5 to 7 mm lower than the indoor side.
3) Insert wall hole sleeve (C).
HolE PoSITIoNS
FOR REAR OR LEFT-REAR PIPING
(The following figure is a front view
of the indoor unit installation location.)
2-3. INDooR uNIT PREPaRaTIoN
Remove the front panel of the indoor unit.
1) Push down the tab on the both sides of the unit to open the front panel.
2) Pull the front panel toward you to remove it.
3) Remove the 2 screws.
4) Open the rear horizontal vane.
5) Push the 2 locations on the top of the panel, and then pull the upper part of the panel toward you.
6) Remove the panel while lifting it up (slightly).
Front panel
Rear horizontal
vane
En-
FOR RIGHT DOWNWARD OR LEFT DOWN-
WARD PIPING
(The following figure is a view of the bottom of
the indoor unit from above.)
Rear horizontal
vane
ø65 mm (KJ25/35)
ø75 mm (KJ50)
Indoor
side
FOR LEFT PIPING
Front panel
Panel
Indoor unit
Push
Indoor unit
Panel
Wall
5 - 7 mm
Outdoor
side
FOR RIGHT PIPING
60
60

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mfz-kj35veMfz-kj50ve

Tabla de contenido