Installing The Line Cell; Installation Of The T-Cell - Norsup UNO Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 48
SALT CHLORINATOR
17-A
17-B
3) Prepare the 2 connectors
and
following
the direction of assembly of the parts shown below.
ATTENTION
Respect the direction of the arrow engraved on
each fitting.
4) Mount the 2 connectors
17-A
/
17-B
and the 2 valves
22
8
in the 2 saddle clamps
in accordance with the
image shown opposite, using Teflon tape.
ATTENTION
17-A
17-B
Do not invert the connectors
and
during assembly: observe the installation
diagram shown on the previous page,
following the direction of the water flow.
16
WWW.NORSUP.EU
6
5) Fix measuring chamber
to the wall using the
screws and plastic anchors provided.
6
6) Connect measuring chamber
to the 2 connectors
17-A
17-B
21
and
, with the semi-flexible tubing
cut
to the right size.
19
7) Remove the storage vial from ORP probe
.
A
8) Loosen nut
(see the image shown opposite)
without removing it.
19
9) Insert the probe
into the measuring chamber
as in the photo below.
A
10) Tighten nut
by hand.
Alterations which serve the technological progress as well as errors excepted!
SALT CHLORINATOR

7.10. INSTALLING THE LINE CELL

6
1) If pipe
A
has an outer diameter of 50 mm, cut the
pipe to a length of 248 mm.
If pipe
A
has an outer diameter of 63 mm, cut the
pipe to a length of 232 mm.
2) Fully disassemble the cell following the above
exploded diagram.
3) Rub down all bonding surfaces with sand
A
C
paper: pipes
, reducers
, collars
B
4) Slide each nut
onto the end of each
A
pipe
.
5) Glue together each set of [pipe
reducer
C
- collar
D
].
6) Wait for the glue to dry completely.
E
7) Place each seal
inside each collar
F
8) Attach cell
with the 2 nuts
ATTENTION
Screw on and tighten nuts
B
Alterations which serve the technological progress as well as errors excepted!

7.11. INSTALLATION OF THE T-CELL

1) Fully disassemble the cell following the exploded
diagram above.
2) Rub down all bonding surfaces with sand paper:
A
B
pipes
, reducers
D
.
3) Glue together the unit comprising
A
[pipes
- reducers
4) Wait for the glue to dry completely.
A
-
5) Place seal
D
all the way into electrode
E
6) Slide electrode
into sleeve
the electrode aligned as in the above diagram.
D
.
F
7) Screw nut
onto sleeve
B
.
ATTENTION
F
Tighten nut
by hand.
by hand.
EN
DE
FR
ES
PT
IT
C
, sleeve
.
B
C
- sleeve
].
E
.
C
, with the plates of
C
.
ORIGINAL MANUAL NORSUP
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Duo seriePro serie

Tabla de contenido