Installation Requirements - Zanussi ZHC590 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Please ensure that when the appliance is installed it is easily accessible to an engineer in the event of a
breakdown.
All installations must comply with the local authorities requirements for the discharge of exhaust air.
Incorrect installation may affect the safety of this cooker hood.

Installation Requirements

Before installation check the wall to which the cooker hood is to be fi tted for electric cables, water pipes or
gas.
This cooker hood is designed to be fi xed to any orizontal surface over a cooking area, and can be used in the
extraction (ducted to the outside) or recirculation mode.
The installation work must be undertaken by a qualifi ed and competent person.
The manufacturer disclaims any responsibility for damage due to incorrect installation of the cooker hood or if the
hood is not installed in compliance with relevant regulations controlling this type of installation.
Unpacking
Before unpacking the cooker hood position the carton
with the arrows pointing upwards as illustrated on the
carton.
The cooker hood is made up of the following com-
ponents:
C
o
Ref.
Q.ty Product Components
1
1
Hood Body, complete with: Controls, Light, Blower,
Filters
2
1
Chimney Upper
7.1
1
Telescopic frame complete with extractor, consisting
of:
7.1a
1
Upper frame
7.1b
1
Lower frame
9
1
Reducer Flange ø 150-120 mm
9a
1
Ø120-125mm collar
10
1
Flange ø 120 mm
15
1
Recirculation Air Outlet Connection
25
2
Pipe clamps
Ref.
Q.ty Installation Components
11
4
Wall Plugs ø 10
12c
4
Screws 2,9 x 6,5
12f
4
Screws M6 x 10
12g
4
Screws M6 x 80
12h
4
Screws 5,2 x 70
21
1
Drilling template
22
4
6.4 mm int. dia washers
23
4
M6 nuts
Q.ty Documentation
1
Instruction Manual
GB
INSTALLING THE COOKER HOOD
mponents
21
23
22
12g
12h
7.1a
7.1
7.1b
2
1
12f
12c
11
15
10
25
9
9a
14

Publicidad

Tabla de contenido
loading

Tabla de contenido