Ceiling Horizontal Installation; Front Grille Safety Support Assembly - Ferroli JOLLY Plus 2 Serie Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Ceiling horizontal installation

Use the paper template, and mark on the ceiling the position of the two fixing brackets and the two rear screws.
Drill using a suitable bit and insert the plugs (2 per bracket) (Fig.1 ref. A); fix the two brackets(Fig.1 ref. B). Do not
overtighten the screws . Fit the unit on the two brackets, keeping it in place and then tighten the two screws in the
rear plugs (Fig.1 ref. C), one on each side. Tilt the unit sufficiently towards the drainage pipe to facilitate the flow of
water (Fig .1 ref . D) .
Tighten all 6 screws .
A
B
A
B
Fig .1
D
C

Front grille safety support assembly

Fig .2
If the fan coil unit is installed in a horizontal position, to
ensure the safety of filter change/cleaning operations,
the installer MUST fit the two safety clamps included in
the bag supplied together with the instruction manual
and the accessories .
A
- Separate the two clamps (Fig .2-A);
- open the front grille and completely undo the spring
fixing screws (Fig.2-B,C);
- fix the two clamps, retightening the screws;
- fix the other part of the clamps to the grille with the
screws supplied;
- close the grill
C
B
A
12

Publicidad

Tabla de contenido
loading

Tabla de contenido