Mettler Toledo IND780 Guia De Instalacion página 60

Ocultar thumbs Ver también para IND780:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 97
2. Check to ensure that sufficient length of cable will remain inside the terminal to make
3. Use a razor knife to cut around the circumference of the insulation about 0.5" away from the
4. Use metal shears to cut back the inner sheath, leaving about 3" or 4" inside the body of the
5. Slide the ferrule over the end of the cable and into the body of the gland. The metal part of the
2-36
METTLER TOLEDO IND780 Installation Guide
connections, then tighten the clamp in position.
body of the gland. Slit the insulation along its length, taking care not to cut into the cable
inside. Remove the insulation.
gland.
Figure 2-56: Inner Sheath Trimmed Back
ferrule will protrude from the body of the gland.
Figure 2-54: Clamp in Position
Ferrule
Figure 2-55: Insulation Trimmed Back
64057253
|
14
|
08/2014

Publicidad

Tabla de contenido
loading

Tabla de contenido