8. Ensure that the appropriate approval region has been selected in setup under Scale > Type >
9. With the front panel installed on the enclosure and snapped into place, thread the free end of
10. Thread the free end of the wire through the hole in the plastic seal (see Figure 2-111).
11. Loop the wire once around the body of the seal (Figure 2-112, Figure 2-116), snap the seal
64057253
|
14
|
08/2014
Approval, and that the Metrology security switch S-1 is in the "on" position.
the wire seal through the center hole at the back of the IND780 front panel, and through the
hole in the retaining clip.
Figure 2-114: Sealing Location at Back of Front Panel
Needle-nosed pliers may be useful, to pull the wire through the holes in the cover and clip.
Figure 2-115: Sealing Wire Threaded Through Cover and Clip
shut and trim off the excess wire.
Figure 2-116: Final Steps in Sealing Harsh Enclosure
METTLER TOLEDO IND780 Installation Guide
2-69