Putting Into Operation - Abicor Binzel BRS-CC Guia De Instalacion

Ocultar thumbs Ver también para BRS-CC:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Putting into operation

6 Putting into operation
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Disconnect the power supply
• Interrupt the compressed-air supply.
NOTICE
• Please take note of the following instructions:
 2 Safety on page EN-3
• The system may only be installed and put into operation by qualified personnel
• Make sure that the cleaning process is not impaired by the collecting tray and the bottle holder.
1
Position 1
2
Clamping position P2
3
Position 3
Fig. 5
Putting into operation
EN - 12
DANGER
(in Germany see TRBS 1203).
1
2
9
8
7
6
4
Position 4
5
Position 5
6
Motor clamp
3
4
5
7
Lowest position (stroke down)
8
Distance sleeve
9
Gas nozzle
BRS-CC

Publicidad

Tabla de contenido
loading

Tabla de contenido