Descargar Imprimir esta página

Stagnoli E24 Manual De Instrucciones página 21

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Operating procedure at the fi rst start up
GB
•Undertake the electric wiring for the plant and
check when the card is switched off.
display
•Check that the mechanical stops have been instal-
led correctly and that the wiring of the two motors
with the respective encoders has been done.
•Unblock the gate and check its movement (the hin-
LED indicator for
E
ged leaves must have no obstacles in their path).
power supply
The stroke of the leaves must not have any stiff
points during movement, it must be smooth.
•Block the gate and supply current to the control board. At this point the electric
r 00
f 00
mains detection led will light up and the display will show
or
. If this
does not occur check that the control board receives power and check the inputs
activated (see the description of the diagnostics on the display).
•Activate the safety devices one at a time and check that the display shows the
relative diagnostics wording. For example, activate the photocell and check that
pho
the message
shows on the display.
setup.
Enter the menu and select the item
The fi rst two manoeuvres help to identify
the start and end of the stroke of the motor. The two that follow detect the peak
of absorption of the motors when the gate is closing and opening. In this phase,
monitor the values shown on the display.
•At the end of the learning phase the display will show ok if programming was
err
done correctly, or
if errors occurred. To exit the programme press the select
key.
•Correctly set the levels of anti-crushing force in opening and in closing, these
must be greater than the maximum values viewed during learning.
WARNING: this regulation can infl uence the degree of safety of an automated
device.
During learning manoeuvres the control board ignores the START and PEDE-
STRIAN commands and works with the force parameters that have been set. Even
if the safeties remain active make sure that there are no objects or people in the
pathway of the gate.
•Carry out some test cycles checking the correct operation of the entire system.
•Measure the force of impact of the gate according to the specifi cations of regu-
lation EN12445.
N.B: If a blackout occours while the automation is working, the fi rst START com-
mand given to the control board with power supply back, will close the gate until
the board fi nds the stops. Let the motor fi nish its run before giving other comman-
ds.
21

Publicidad

loading

Productos relacionados para Stagnoli E24