Installation And Getting Started - auna KR-400 Manual De Instrucciones

Radio de cocina
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN
26

INSTALLATION AND GETTING STARTED

Unpacking
Unpack all parts and remove protective material.
Do not connect the unit to the mains before checking the main voltage
and before all other connections have been made.
Do not cover any vents and make sure that there is a space of several
centimeters around the unit for ventilation.
Backup battery installation
This device provide a battery backup system to memory your clock time,
preset memory of tuner and timer once the AC source was interrupted.
Follow the engraved marking in the compartment to install 2pcs "AA
" size battery(not included) with the correct direction to the battery
compartment. Then cover the battery door.
Alkaline type battery recommended for long life performance.
Montage
1. Verwenden Sie die beiliegende Montageschablone, um
Bohrmarkierungen anzuzeichnen.
2. Bohren an den gesetzten Markierungen Sie Löcher mit einem
Durchmesser von 3,5 mm.
3. Befestigen Sie das Montageblech mit den Abstandshaltern und den
Schrauben unter dem Hängeschrank.
4. Schieben Sie die Führungsschienen des Küchenradios über das
Montageblech.
Screw mounting template

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1003188010031894

Tabla de contenido