Preparing The Opening - Wayne Dalton 9100 Instrucciones De Instalación Y Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

P5
WARNING
Tools Needed:
Recommended
MOUNTING PAD TO STRUCTURALLY SOUND
tools from
FRAMING COULD CAUSE SPRINGS TO VIOLENTLY
page 5
PULL MOUNTING PAD FROM WALL, RESULTING
IN SEVERE OR FATAL INJURY.
If you just removed your existing door or you are installing a new
door, complete all steps in PREPARING THE OPENING.
For detailed technical information regarding the opening
preparation, refer to the DASMA Technical Data Sheet TDS #161
Connecting Garage Door Jambs to Building. Framing located at
www.dasma.com.
The inside of your garage door opening should be framed with
wood jambs and header. It is recommended that 2" x 6" lumber
be used. The jambs must be plumb and the header level. The
jambs should extend a minimum of 12" (305 mm) above the
top of the opening for TorqueMaster
For low headroom applications, the jambs should extend to
the ceiling height. Minimum side clearance required, from the
opening to the wall, is 3-1/2".
IMPORTANT: CLOSELY INSPECT JAMBS, HEADER AND MOUNTING
SURFACE. ANY WOOD FOUND NOT TO BE SOUND, MUST BE
REPLACED.
The jambs and header must be securely fastened to sound
framing members. Do not place jambs and header over drywall,
paneling, etc. Heads of fasteners must be fl ush or below jamb
and header surface, so they do not interfere with installation or
operation of new door.
TorqueMaster
surface must be fi rmly attached to the wall, above the header at
the center of the opening.
The mounting surface must be 2" x 6" lumber minimum (Select
southern yellow pine lumber. Do not use lumber marked as
spruce-pine-fur or SPF).
The mounting surface must be securely attached to block or
concrete wall with four (4) 3/8" masonry anchors or four (4)
5/16" x 4" lag screws for a wood structure.
NOTE: Drill a 3/16" pilot hole in the mounting surface to avoid
splitting the lumber. Do not attach the mounting surface with
nails.
WEATHER SEAL: Fit weather seal (may not be included) to fi t the
jambs and header. Align the edge of the weather seals an 1/8" to
1/4" inside the edge of the opening. Temporarily nail the weather
seal to the jambs to keep the bottom section from falling out of
the opening during installation.
NOTE: Do not permanently attach weather seal to the jambs at
this time. Permanent installation will be done in Step 30.
HEADROOM REQUIREMENT: Headroom is defi ned as the space
needed above the top of the door for tracks, springs, etc. to allow
the door to open properly. If the door is to be motor operated,
2-1/2" (64 mm) of additional headroom is required.
NOTE: 6" LHR Conversion Kit is available for 12" Radius only.
Contact your local Wayne-Dalton
BACKROOM REQUIREMENT: Backroom is defi ned as the
distance needed from the opening back into the garage to allow
the door to open fully.
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Preparing the Opening

FAILURE TO SECURELY
ATTACH A SUITABLE
®
counterbalance systems.
®
counterbalance systems, a suitable mounting
®
dealer.
HEADER BOARD
2" X 6" LUMBER
PREFERRED
LEVEL HEADER
PLUMB JAMBS
DOOR
WIDTH
HEADROOM
HEADER
WEATHER SEAL
JAMB
HEADROOM REQUIREMENT
TRACK TYPE
TorqueMaster
15" Radius track
11-3/4" (299 mm)
12" Radius track
10-1/2" (267 mm)
6" LHR Kit
6" (152 mm)
BACKROOM REQUIREMENT
DOOR HEIGHT
TRACK
6'5", 6'6", 7'0" 12", 15" Radius
7'6", 8'0"
12", 15" Radius
SUITABLE MOUNTING
SURFACE 2" X 6"
LUMBER MINIMUM
DOOR
HEIGHT
BACKROOM
JAMB
WEATHER
SEAL
JAMB
QUICK INSTALL TRACK
®
MANUAL
MOTOR
LIFT
OPERATED
98"
120"
(2489 mm)
(3048 mm)
110"
132"
(2794 mm)
(3353 mm)

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Wayne Dalton 9100

Este manual también es adecuado para:

94009600

Tabla de contenido