Descargar Imprimir esta página

Pentair Raychem E-100-A Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

5
• Pull heating cable back through bottom of end seal stand
until braid is just visible above strain relief. Use cable
lubricant if needed.
7
• Install cap; tighten until the slot on the cap and the slot
on the stand align.
8
• Fasten end seal to pipe with strap. Do not
pinch heating cable.
• Install cable tie.
• Loop and tape extra heating cable to pipe.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Fasten end seal label to insulation.
• Leave these installation
instructions with the user for
future reference.
INDUSTRIAL HEAT TRACING SOLUTIONS
Braid
Strain
relief
Pipe strap
EN-RaychemE100Aendseal-IM-H55400      02/15
6
CAUTION: Health
Hazard. Wash
hands after contact
with sealant.
Consult material
safety data sheet
VEN 0058.
• Push boot onto the
end of the heating
cable until it
bottoms out.
Note: For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) between
stand and pipe.
Trim
JBS-SPA
adapter for
small pipes
Cable tie
Glass cloth tape
Position
adapter
this side
up.
4 / 6

Publicidad

loading