Descargar Imprimir esta página

Pentair Raychem E-100-A Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

E-100-A Re-entry Instructions
A
WARNING: Shock Hazard.
Conductors will be
exposed. Re-entry should
only be performed by
qualified personnel.
Follow standard electrical
lockout procedures before
opening end seal.
• Turn off power.
• Clip cable tie and remove.
C
CAUTION: Health Hazard.
Wash hands after contact
with sealant. Consult
material safety data
sheet VEN 0058.
• Grab black ring and remove boot.
E
• Inspect boot. If boot is damaged or sealant appears dry or
missing, replace boot. For replacement boots, order kit
E-100-BOOT-5/PACK. Otherwise, re-install boot.
INDUSTRIAL HEAT TRACING SOLUTIONS
B
• Unscrew cap from end seal stand.
D
• Test as required.
• Refer to Industrial Heat-Tracing Installation and
F
• Install cap; tighten until the slot on the cap and the slot
• Install new cable tie.
EN-RaychemE100Aendseal-IM-H55400      02/15
Maintenance Manual (H57274) for test procedures.
on the stand align.
Trim
5 / 6

Publicidad

loading