Transport, Assembly, Putting into Operation and Decommissioning
Assembly (Built-in appliances only)
Figure 5
Step 1: Preparation
Prepare cut-outs in the worktop corresponding to the indicated dimensions.
The worktop cut-out dimensions are given in mm as shown in the drawing.
Remove the protective plastic film from the metal plates.
Step 2: Installation
EBR/V19-26
Insert the appliance into the worktop cut-out from above and fasten it.
Figure 6
4330000_A3
TE-2/V19-26, 27-33 | TE-2/VK19-26 | TEH-1/V19-26, 27-33 | TEH-2/V19-26, 27-33 | TEUH-1/VS19-26 | TEUH-2/VS19-26, 27-33 | TEUH-2/VC19-26
Worktop cut-out EBR/V27-33
Assembly instructions EBR/V19-26
EBR/V19-26, 27-33 | EBRH/V19-26, 27-33 | EBRH-2/V19-26
Chapter 4
Page 21
Plate dispenser