Installation Procedure - Toto GO TBG01201U Manual De Instalación Y Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Confirm that the valves
have been installed
properly.
See the TBN01201/TBN01202
installation manual for further
information.
2. Orient handle assembly and lower onto the valve until engaged. Fasten
handle escutcheon to collar with provided set screw. Tighten with hex key
as needed.
3. Repeat for other handle assembly.
NOTE: If handles do not line up exactly as desired, remove
handle assembly from valve and reinstall one (1) notch over (on
valve).
Fine adjustment may be done by slightly rotating valve from underneath
installed surface.
4. Remove plug cover from outlet.
5. Orient spout assembly as shown and lower onto exposed portion of valve
body. Fasten spout to valve body with provided set screw.
Tighten with hex key as needed.
**Installation of TBG01201, TBG02201 or TBG03201 is now complete.
If installing TBG01202, TBG02202 or TBG03202, please continue.

INSTALLATION PROCEDURE

HOT
TBN01202 ONLY
(4 Hole Roman Tub Filler Rough-in)
4
Collar
Plug cover
Collar
COLD
Collar

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gr tbg02201uGs tbg03201uGo tbg01202uGr tbg02202uGs tbg03202u

Tabla de contenido