Panel-Mount Stiffener Bracket; Harsh Enclosure Idnet Bracket - Mettler Toledo Division 2 IND570 Serie Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation Guide (#30205319) for details on how to mount the harsh or panel-mount enclosures
and how to make the required terminal block connections for the power, scale and other
accessories. Special installation requirements for the IND570xx terminals are described below.
They are also listed in the Special Conditions for Safe Use section of this manual.
In addition to the information in this chapter, instructions, control drawings, installation drawings
and details listed in the certificates found in Chapter 3 and Appendix A of this guide must be
followed during the installation.
2.10.1.

Panel-Mount Stiffener Bracket

When installing the panel-mount IND570xx terminal, note that the panel stiffener bracket included
with the terminal must be used to ensure the required IP rating.
After inserting the panel enclosure through the mounting hole in the panel, slide the stiffener bracket
over the housing, then install and tighten the two mounting clamps. The stiffener bracket and
mounting clamps are shown installed in Figure 2-6.
2.10.2.

Harsh Enclosure IDNet Bracket

Note that for harsh enclosures that include an IDNet scale interface, a bracket (included with unit)
must be installed to protect the connector from a direct impact. This bracket must remain intact to
properly protect the IDNet connector and maintain the ATEX and IECEx approvals. Refer to Figure
2-7 for an example of the IDNet bracket installed on an ATEX certified IND570xx.
30205321
|
02
|
05/2017
Figure 2-6: Panel Stiffener Bracket Installed
METTLER TOLEDO IND570xx Division 2 and Zone 22 Installation Manual
Panel
stiffener
Mounting
clamps
2-11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ind570 serie

Tabla de contenido