22) Remove the cap from the tiller handle assembly, and
loosen the 8 x 50 mm socket bolt by approx. 10 mm (0.4 in).
1
Remove the shift lever from the tiller handle assembly by
tapping the bolt head with a plastic hammer.
2
Remove the 8 x 50 mm socket bolt and the 8 mm washer
from the shift lever, and remove the lever stopper and the
3
shift lever from the tiller handle assembly.
4
Remove the 20.6 x 1.9 mm O-ring from the shift lever.
Replace the O-ring with a new one.
5
Check the bushing for wear or damage and replace it with
a new one if necessary.
6
7
8
9
23) Remove the two 6 x 12 mm bolt washers from the shift
frame assembly.
10
24) Remove the three 5 x 12 mm bolts and the three 5 mm
washers, and remove the throttle arm/throttle rod
11
assembly and the shift frame assembly as a set.
12
25) Remove the 9 mm E-ring, and remove the throttle rod and
the two 10 mm washers.
13
[1]
5 x 12 mm BOLT (3)
14
15
[9]
5 mm WASHER (3)
16
17
[8]
GUIDE PLATE
18
19
20
16-15
[1] CAP
[6]
20.6 x 1.9 mm O-RING
[2]
[3]
THROTTLE ARM
THROTTLE ROD
588
[2]
8 x 50 mm
SOCKET BOLT
[3]
8 mm WASHER
[4]
LEVER
STOPPER
[5]
BUSHING
[7]
SHIFT LEVER
[4]
10 mm WASHER (2)
[5]
9 mm E-RING
[6]
6 x 12 mm BOLT
WASHER (2)
[7]
SHIFT FRAME
ASSEMBLY