Installation
Installation note: For valve body installation, please see valve body manual.
G
J
1) Install diverter handle or volume
control handle (J) into shower
escutcheon (G).
D
H
I
4) Install handle (D) to valve and
secure with set screw (H). Install
plug button (I).
Note:
Handle should be facing the 12
o'clock position.
Operation (Temperature Control)
1) Turn shower handle counter-
clockwise approximately 1/4 turn
to put valve in cold position.
F
2) Install shower escutcheon (G) to
shower valve. Secure with two
screws (F).
2
B
5) Attach shower arm (B) and flange
(C) to vertical shower pipe. Turn
clockwise to tighten.
2) Turn shower handle counter-
clockwise approximately 1/2 turn
to put valve in warm position.
G
C
3
E
3) Install dome cover (E) to valve by
turning clockwise.
A
6) Install showerhead (A) to shower
arm (B). Turn clockwise to tighten.
3) Turn shower handle counter-
clockwise approximately 3/4 turn
to put valve in hot position.
B