Connect To Ductwork; Connect Electric; Install Chimney; Final Steps - Siemens LC479050UC Manual De Instalación

Ocultar thumbs Ver también para LC479050UC:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7) Connect to Ductwork

8) Connect Electric

9) Install Chimney

10) Final Steps

Tighten the screws.
Install two lower hood screws from underneath.
Figure 5: Tighten Screws
Connect hood to ductwork in house.
Plug electrical cord into grounded outlet. Note: The hood requires a 120V AC,
60Hz., 15A Branch Circuit.
Remove protective film from both sections of chimney.
Connect the sections, one inside the other, being sure that the vent holes in the
upper section point down.
CAUTION: Be careful not to scratch chimney surface when connecting. Slide tem-
plates between the two chimney sections to protect them.
Insert bottom edge of chimney into top of hood. Slide upper section up until it is
flush with the surface above. Attach to chimney mounting bracket with two sheet
metal screws.
Figure 6: Install Chimney
3.
1.
2.
Remove templates from between chimney sections if necessary. Remove protec-
tive film from hood. Install grease filters (See Use and Care Manual).
Test the installation.
English 5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lc479650uc

Tabla de contenido