Flush Mounted Installation - 200Mm Deep - Dimplex BLF50-EU Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Fireplace Installation
Figure 6
Mounting
hole
completing the wiring according
to national and Local Elecrical
Codes.
WARNINg: Do not attempt
to wire your own new outlets or
circuits. to reduce the risk of fire,
electric shock or injury to persons,
always use a licensed electrician.
Ensure that the 3-Position switch is
set to the off position ("o") and that
the circuit on which the fireplace is
to be installed has the power cut off
at the service panel until installation
is complete.
3.
Lift fireplace and insert into
opening (Figure 5).
4.
use bubble level (supplied) to
level the fireplace within the
framing. Adjust as required.
5.
Drive four (4) supplied
mounting screws through
the four (4) mounting holes
located in each corner of the
fireplace chassis, into wall
studs (Figure 6).
6.
refer to Front Glass
Installation section, for final
installation procedures.
Flush Mounted
Installation - 200mm Deep
CAUTION: Two people may
be required for various steps
of this procedure.
1.
Prepare a wall with a framed
opening of 124.5 cm wide x
47 cm high (Figure 7).
!
NOTE: The sizing has allowed
for 6.4mm around the fireplace
Figure 7
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Blf50-au

Tabla de contenido