Electrical Installation; Important Notes; Design Including A Connector - Lenze L-force MCA Esquema De Conexiones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4

Electrical installation

Important notes

ƒ Carry out the electrical installation according to the relevant regulations (like cable
cross-sections, fusing, connection to the PE conductor). Additional notes can be
found in the detailed operating instructions.
ƒ For the connection, the following has to be observed:
– A safe PE connection has to be established,
– The specified clearances between bare live parts among each other and against
earth must be observed.
– The terminal box has to be free of foreign bodies, dirt, and humidity.

Design including a connector

For the motor connection, the use of Lenze system cables is recommended.
Stop!
Tighten the coupling ring of the connector.
ƒ
If plugs without SpeedTec bayonet nut connectors are used, the connector
ƒ
boxes for the power / encoder / fan connections must be secured by
O-rings if loadings by vibration occur:
– M17 connector box with O-ring 15 x 1.3 mm
– M23 connector box with O-ring 18 x 1.5 mm
– M40 connector box with O-ring 27 x 4.0 mm
Never disconnect plugs when voltage is being applied! Otherwise, the
ƒ
plugs could be destroyed! Inhibit the controller before disconnecting the
plugs!
Note!
Plug-in connectors (plug/connector box) with SpeedTec bayonet nut
connectors are vibration-proof.
ASPL 33.0006 DE/EN/FR/ES/IT 2.0
Electrical installation
Important notes
4
25

Publicidad

Tabla de contenido
loading

Tabla de contenido