EN
The thirteen hole
from top
STEP 5
STEP 8
16
SET3 DRAWER ASSEMBY GUIDE
4 existing wall support
The one hole
out hole
from top
The two
hole from
top
STEP 1
The four hole
out hole from top
The thirteen hole
from top
STEP 3
STEP 6
40MM
The three hole
out hole from top
The one hole
out hole
from top
The two hole
from top
STEP 2
STEP 4
STEP 7
G1X3 slider guide left
G2X3 slider guide right
DI 1st drawer
D2 2nd drawer
D3 3rd drawer
S1X2 bridge beam
D1=D2
STEP 9
The eight hole
from top
28MM
PARTS LISTS