Figure 7: Version without CE stop
3 potentiometer for Up Off
4 potentiometer for Down Off
3
4
Figure 8: Version with CE stop
1 potentiometer for Up Off
2 potentiometer for Down Off
3 potentiometer for CE stop
4 Warning signal generator
The maximum height from the upper edge of the
base plate to the upper edge of the lift rails, during
the change of the "bottom off" via the potentiom-
eter on the controls, must not exceed 695 mm.
108
3
4
height from the
upper edge of the
base plate to the
upper edge of the
lift rails must not
exceed 695 mm.
1
2
• Remove the operating unit on the operating col-
umn.
• If potentiometer 3 (for "Up Off") is turned an-
ti-clockwise, the upper holding point is moved up-
wards and the lift stops later in the lifting process.
• If the potentiometer 3 (for "Up Off" is turned
clockwise, the upper holding point is moved
downwards and the lift stops earlier in the lifting
process.
• If potentiometer 4 (for "Down Off") is turned an-
ti-clockwise, the lower holding point is moved
upwards and the lift stops earlier in the lowering
process.
• If the potentiometer 4 (for "Down Off") is turned
clockwise, the lower holding point is moved
downwards and the lift stops later in the lowering
process.
In the following alignment work it must be abso-
i
lutely ensured that a block movement of the lift
is prevented. The potentiometer for the "Up or
Down Off" may only be fine-adjusted, meaning
the potentiometer is slightly adjusted, then the
lift is actuated. Repeat the procedure until the
desired end point of the lifting rails is reached.
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL - HYMAX S 3000-S3500-S4000_V1.2_DE-EN-FR-ES-IT
The maximum
If improper settings are done on the
potentiometer, this can lead to mal-
functioning of the lift and even to dan-
ger for life and limb and permanent
damage to the lift and the vehicle on
it.