Descargar Imprimir esta página

Swing-N-Slide Alpine PROJECT 611 Manual De Instrucciones página 30

Ocultar thumbs Ver también para Alpine PROJECT 611:

Publicidad

Front Opening Option #1
2'' x 4'' x 62-1/2''
Fig. 29
(Left Side Rail)
(1) 2'' x 4'' x 23-1/4''
44
40 3/4
28 5/8
16 1/2
4 3/8
E X A M PL E OF L A D D ER R U NG I N STA L L AT I O N
1-1/4''
/nails
screws
(3)
• BOTTOM OF LADDER RAIL •
2-1/2'' screws/nails
each side
2-1/2'' or 10D
screw/nail
(4) 2'' x 4'' x 20-1/4''
(2) 2-1/2'' Screws/Nails
(2) 2-1/2'' Screws/Nails
39 1/8
(2) 2-1/2'' Screws/Nails
27
14 7/8
(2) 2-1/2''
Screws/Nails
2 3/4
(6)
Fig. 31
(2)
2-1/2'' screws/nails
each side
(see page 38 for Climbing Rock Wall Front Opening Option #2.)
(Front)
23 1/4
(4) 2'' x 4'' x 20-1/4''
39 1/8
27
O. Ladder Assembly.
1. On ladder rails, mark all measurement locations for
each side with a pencil. Draw an angle line
connecting measurements for each ladder rung
alignment. (Fig. 29)
2. Align top of step bracket with line and screw in
place. Install a ladder rung at each of the four
locations. (Fig. 29, 30) Repeat on other ladder
rail.
3. Attach 2'' x 4'' x 23-1/4 to siderails using
(2) 2-1/2'' screws/nails per side.
4. Secure ladder to unit. (Fig. 31) Note: The top step
should be 11" below the deck and all steps should
be level.
5. Screw (2) 2-1/2" screws/nails into the ends of each
ladder rung through the left and right side rails.
(Fig. 31)
30
2'' x 4'' x 62-1/2''
(Right Side Rail)
(1) 2'' x 4'' x 23-1/4''
(2) 2-1/2'' Screws/Nails
(2) 2-1/2'' Screws/Nails
(2) 2-1/2'' Screws/Nails
28 5/8
(2) 2-1/2''
16 1/2
14 7/8
Screws/Nails
4 3/8
Fig. 30
2 3/4
(6) 1-1/4'' screws or
4D nails
44
40 3/4

Publicidad

loading

Este manual también es adecuado para:

Alpine project 612