Descargar Imprimir esta página

Swing-N-Slide Alpine PROJECT 611 Manual De Instrucciones página 35

Ocultar thumbs Ver también para Alpine PROJECT 611:

Publicidad

Front Opening Option # 2
Fig. 39
(4)
2-1/2'' screws/nails
(Underneath)
2-1/2'' screws/nails
(Per joint)
2-1/2'' screw or nail
PROJECT 612 ONLY
(2)
Fig. 39b
(3)
2-1/2'' screws/nails
(both sides)
(see page 32 for Ladder Assembly Front Opening Option #1.)
3-3/8''
4' Climbing Rock Wall will require
m m i i n n . . 8 8 C C l l i i m m b b i i n n g g R R o o c c k k s s
T. Climbing Wall.
(1) 2x4x8 --- (2) 2x4x47-3/4
(1) 2x4x8 --- (1) 2x4x43-1/4 (1) 2x4x23-1/4
(3) 5/4x6x10--(3) 5/4x6x30
1. Assemble and install Climbing Wall Frame and
body as shown in (Fig. 39), (Fig. 39a).
2. Attach (9) 5/4'' x6'' boards to (2) 2'' x 4'' boards
and install on unit as shown in (Fig. 39b).
3. Use a pencil to mark where you would like
the Climbing Rocks to be installed. Double check
your spacing and secure Rock at each location.
Note: Make sure the 2'' x 4'' supports do not
interfere with the mounting of the climbing
rocks.
35
Fig. 39a
screws/nails
(Per joint)
23-1/4''
N N O O T T E E : :
(2)
2-1/2''

Publicidad

loading

Este manual también es adecuado para:

Alpine project 612