Refrigerant Pipe And Drain Pipe Specifications; Refrigerant Pipe, Drain Pipe And Filling Port; Connecting Refrigerant Pipes And Drain Pipes; Refrigerant Piping Work - Mitsubishi Electric CITY MULTI PEFY-P-VMR-E-L Serie Manual De Instalación

Ocultar thumbs Ver también para CITY MULTI PEFY-P-VMR-E-L Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 26

7. Refrigerant pipe and drain pipe specifications

To avoid dew drops, provide sufficient antisweating and insulating work to the re-
frigerant and drain pipes.
When using commercially available refrigerant pipes, be sure to wind commer-
cially available insulating material (with a heat-resisting temperature of more than
100 °C and thickness given below) onto both liquid and gas pipes.
Be also sure to wind commercially available insulating material (with a form
polyethylene's specific gravity of 0.03 and thickness given below) onto all pipes
which pass through rooms.
1 Select the thickness of insulating material by pipe size.
Pipe size
6.4 mm to 25.4 mm
28.6 mm to 38.1 mm
2 If the unit is used on the highest story of a building and under conditions of
high temperature and humidity, it is necessary to use pipe size and insulating
material's thickness more than those given in the table above.
3 If there are customer's specifications, simply follow them.

8. Connecting refrigerant pipes and drain pipes

8.1. Refrigerant piping work

This piping work must be done in accordance with the installation manuals for both
outdoor unit and BC controller (simultaneous cooling and heating series R2).
Series R2 is designed to operate in a system that the refrigerant pipe from an
outdoor unit is received by BC controller and branches at the BC controller to
connect between indoor units.
For constraints on pipe length and allowable difference of elevation, refer to
the outdoor unit manual.
The method of pipe connection is brazing connection.
Caution:
Install the refrigerant piping for the indoor unit in accordance with the
following.
1. Cut the tip of the indoor unit piping, remove the gas, and then remove the
brazed cap.
[Fig. 8.1.1] (P.3)
A Cut here
B Remove brazed cap
2. Pull out the thermal insulation on the site refrigerant piping, braze the unit
piping, and replace the insulation in its original position.
Wrap the piping with insulating tape.
Note:
Pay strict attention when wrapping the copper piping since wrapping the
piping may cause condensation instead of preventing it.
*
Before brazing the refrigerant piping, always wrap the piping on the main
body, and the thermal insulation piping, with damp cloths to prevent heat
shrinkage and burning the thermal insulation tubing. Take care to ensure
that the flame does not come into contact with the main body itself.
[Fig. 8.1.2] (P.3)
A Thermal insulation
C Wrap with damp cloth
E Ensure that there is no gap here
Cautions On Refrigerant Piping
s s s s s Be sure to use non-oxidative brazing for brazing to ensure that no for-
eign matter or moisture enter into the pipe.
s s s s s Be sure to apply refrigerating machine oil over the flare connection seat-
ing surface and tighten the connection using a double spanner.
s s s s s Provide a metal brace to support the refrigerant pipe so that no load is
imparted to the indoor unit end pipe. This metal brace should be pro-
vided 50 cm away from the indoor unit's flare connection.
Warning:
When installing and moving the unit, do not charge it with refrigerant other
than the refrigerant specified on the unit.
- Mixing of a different refrigerant, air, etc. may cause the refrigerant cycle to mal-
function and result in severe damage.
Insulating material's thickness
More than 10 mm
More than 15 mm
B Pull out insulation
D Return to original position
F Wrap with insulating tape
7.1. Refrigerant pipe and drain pipe specifi-
cations
Item
Refrigerant pipe
Liquid pipe
(Brazing connection)
Gas pipe
Field drain pipe
7.2. Refrigerant pipe, drain pipe and filling
port
[Fig. 7.2.1] (P.3)
A Refrigerant pipe (liquid pipe)
B Refrigerant pipe (gas pipe)
C Drain pipe
Caution:
Use refrigerant piping made of C1220 (Cu-DHP) phosphorus deoxidized
copper as specified in the JIS H3300 "Copper and copper alloy seamless
pipes and tubes". In addition, be sure that the inner and outer surfaces of
the pipes are clean and free of hazardous sulphur, oxides, dust/dirt, shav-
ing particles, oils, moisture, or any other contaminant.
Never use existing refrigerant piping.
- The large amount of chlorine in conventional refrigerant and refrigerator oil
in the existing piping will cause the new refrigerant to deteriorate.
Store the piping to be used during installation indoors and keep both
ends of the piping sealed until just before brazing.
- If dust, dirt, or water gets into the refrigerant cycle, the oil will deteriorate and
the compressor may fail.
Use Suniso 4GS or 3GS (small amount) refrigerator oil to coat the flare
and flange connection part. (For models using R22)
Use ester oil, ether oil or alkylbenzene (small amount) as the refrigerator
oil to coat flares and flange connections. (For models using R410A)
- The refrigerant used in the unit is highly hygroscopic and mixes with water
and will degrade the refrigerator oil.

8.2. Drain piping work

1. Ensure that the drain piping is downward (pitch of more than 1/100) to the
outdoor (discharge) side. Do not provide any trap or irregularity on the way.
(1)
2. Ensure that any cross-wise drain piping is less than 20 m (excluding the differ-
ence of elevation). If the drain piping is long, provide metal braces to prevent it
from waving. Never provide any air vent pipe. Otherwise drain may be ejected.
3. Use a hard vinyl chloride pipe VP-20 (O.D. 26 mm) for drain piping.
4. Ensure that collected pipes are 10 cm lower than the unit body's drain port as
shown in 2.
5. Do not provide any odor trap at the drain discharge port.
6. Put the end of the drain piping in a position where no odor is generated.
7. Do not put the end of the drain piping in any drain where ionic gases are
generated.
[Fig. 8.2.1] (P.3)
A Downward slope 1/100 or more
B Connection dia. VP-20 (O.D. 26 mm)
C Indoor unit
D Collective piping
E Maximize this length to approx. 10 cm
Model
20·25·32
ø 6.35
ø 12.7
VP-20 (O.D. 26 mm)
9

Publicidad

Tabla de contenido
loading

Tabla de contenido