Horizontal Discharge Installation - Broan Elite E64000 Serie Manual Del Usuario

Ocultar thumbs Ver también para Elite E64000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. CHOOSE THE OPENING(S)
Remove the knockout for the chosen opening(s) (horizontal at the back of the hood or vertical on top).
See illustrations below.
V
ERTICAL DISCHARGE
H
ORIZONTAL DISCHARGE
NOTE:
For ducted installation
only.
Punch out the appropriate electrical knockout hole on top (A) or back (B) of the
hood. Install the wire clamp (included in parts bag).
NOTE: For a non-ducted installation, punch out the back electrical knock-out (B).

7. HORIZONTAL DISCHARGE INSTALLATION (

All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration. For a horizontal
discharge configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the back panel of the
hood. The procedure below applies for one or two motors.
Unplug the blower.
Using a 5/16" socket, remove all
blower mounting screws from the
inner top of the hood. Keep the
screws for further use.
(INTERNAL BLOWER HOODS ONLY)
1
1
HR0021
HE0085
L
S
EFT
IDE
S
L
CREW
HD0269
- 9 -
2
2
A
HR0024
INTERNAL BLOWER(S) ONLY)
M
OUNTING
OCATION
3
3
B
R
S
IGHT
IDE
M
S
OUNTING
CREW
L
OCATION
HD0282

Publicidad

Tabla de contenido
loading

Tabla de contenido