After the opening in the roof and interior ceiling are the correct size,a framed support structure must be placed
between the exterior roof top and interior ceiling. The reinforced framed structure must follow the follwing
guidelines:
1. It must be capable of supporting both the weight of the roof
top air conditioner and the interior ceiling assembly.
2. It must be capable of holding the roof outer surface and interi-
or ceiling apart and supporting them, so that when the roof top
3. air conditioner and ceiling assembly are bolted together.no
collapsing occurs. A typical support frame is shown in picture
next side.
4. There must be an opening through the frame for the power
supply wiring. Route the supply wiring through the frame at the
5. same time the support frame is being installed.
important Hints on Mounting
• The roof top air conditioner must be mounted on a level plane from front to rear and side to side when the
vehicle is parked on a level plane. Figure 2 shows maximum allowable degrees that the unit can be mounted
above or below level.
• If the roof of the vehicle is sloped (not level) such that the roof top air conditioner cannot be mounted within
the maximum allowable degree specifications, an exterior leveling shim will need to be added to make the
unit level. A typical leveling shim is shown inpicture on the next side.
• Once the roof top air conditioner has been leveled, some additional shimming may be required above the
interior ceiling assembly. The roof top air conditioner and the interior ceiling assembly must be square with
each other before they are secured together.
• After the mounting hole area is properly prepared, remove the carton and shipping pads from around the
roof top air conditioner. Carefully lift the unit on top of the vehicle. Do not use the outer plastic shroud for
lifting. Place the roof top air conditioner over the prepared mounting hole.
• The point end (nose) of the shroud must face toward the front of the vehicle.
Above level 5° Max
Below level 0° Max
NOTE: Try you best to put the unit on the horizontal surface for operation. The unit can only operate for a short
time at the maximum sloping angle of 5° for preventing water leakage.