PREPERATION FOR OPERATION
After removing scale from its package
installation
could
be
accomplished
by
following instructions given in "ASSEMBLY
WARNINGS" part.
In models using post part, after setting the
post to desired angle, screw the connecting
screw to stabilize it.
Place the scale on a horizontal stable base.
Avoid disturbing environmental conditions
such as shocks, vibrations and air currents.
For setting the scale parallel to the base just
turn the adjustable feet in order to stable the
spirit level. (The bubble of the spirit level
must be within the indicating circle)
Attach the adaptor to an electric outlet that
has ground (220V), and connect it to adaptor
input. There is an on/off key near the adaptor
input. You can operate scale from this key.
NOTE: If scale has a rechargeable battery
(sealed lead type), it should be charged at
least 8 hour before first operation.
NOTE: There are protecting bands on the
back display and post display. Taking out
these bands make clear seeing the display.
There may be white or blue band to protect
stainless steel part of the scale. It should be
taken off before using the scale.
ASSEMBLY WARNINGS
NT HOLDING WIRE:
NTK:
- 1 -
ASSEMBLY OF TEB SCALE:
Connect post to the bottom chassis with
metric 10x25 imbus bolts.
Attach the shield with 10x25 hexagon bolts.
Attach indicator to the post like above. Do
not remove after looked up. To remove
indicator from post, remove two screws near
the post connector.
- 2 -