Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
TOPMOUNT INSTALLATION
NOTE: Topmount sinks are dropped into the counter from above. If you are installing an undermount sink,
please see "Undermount Installation". Sink template (1A) shows cut-lines for both undermount and topmount
installations. Review it carefully and follow the outer topmount cut-lines only to install the sink over your counter.
PREPARING THE AREA
- Center the template (1A) on the counter
so that it is parallel to the front of the
counter (ensuring that it will not interfere
with the inside structure of the cabinet or
the counter). It must clear the overhang
of the counter and the front inside face of
the cabinet .
- Keep in mind that the typical setback is 3 1/2
- 4 in. (89 mm - 102 mm) from the front of
the counter to the sink bowl (depending on
the cabinet structure, the counter overhang,
the type of sink bowl, and the deck size).
- Ensure there is adequate clearance to
install the mounting hardware underneath
the counter .
Please contact cs@conglomkb .com or 1-877-333-0098 for further assistance .
CUTTING THE COUNTER
- Secure the sink template (1A) to the counter
top using masking tape .
- Place a support underneath the cut-out
portion of the counter to prevent it from
falling during cutting . Use an appropriate saw
to cut along the topmount cutline .
- Insert the sink (A) into the cut-out in the
counter to test the fit. Make adjustments to
the cut-out, if necessary .
Tape
1A
Topmount installation
Fig . 5
9
CAUTION: Always wear safety goggles
and gloves when using power tools to
prevent personal injury .
Typical Setback
3 1/2 - 4 in.
(89 mm - 102 mm)
CONGLOMKB .COM

Publicidad

Tabla de contenido
loading

Tabla de contenido