/h of flow through the electrolytic cell housing to achieve the rated production of chlorine. The system can
3
be plumbed with the full flow of the circulation system flowing through the cell housing or a bypass can be created to achieve 9 m
/h of flow through the
3
cell housing. In either case the cell housing must be installed as the last component in the return to the pool, after all other equipment. The vessel has 4
mounting holes for attaching to a floor or mounting surface. See the plumbing diagrams below.