4. Connect the power cable and the ethernet cable (RJ45) to the correct ports of your
GWN7610.
5. Align the arrow on the GWN7610AP with the arrow on the locking tab of the mounting
bracket and ensure that your GWN is firmly seated on the mounting bracket.
6.Turn the GWN clockwise until it locks into place and fits the locking tab.
5
Ceiling Mount
1. Remove the ceiling tile.
2. Place the ceiling backing plate in the center of the ceiling tile and mark the mounting
screw holes (screw holes DIA 5.5mm, reticle hole DIA 25mm).
3. Insert the screws through the mounting
Ceiling Mounting
4. Connect the power cable and the Ethernet cable (RJ45) to the correct ports of your
GWN7610.
bracket.
M3 nut
M3.0x50 screw
6