Eaton NFFLD-L Instrucciones De Instalación página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Yoke Mounting (Figure 3.)
Tools Required
Torque wrench (ft-lbs) and 3/4" socket.
1.
Mount luminaire to surface using the hole pattern
provided on the yoke.
Hardware recommended 1/2" diameter bolt x 1-1/2"
N
ote:
long. (Supplied by others)
2.
Loosen but do not remove (2) center bolts. (Figure 3.)
3.
Rotate luminaire to desired aiming position and tighten
center bolts to 75 ft-lbs.
4.
Refer to wiring diagrams for power connection.
(Figure 4.)
Figure 3.
Figure 4.
7/8"
(23mm)
3-13/16"
(97mm)
19"
(485mm)
Installation Instructions - NFFLD-L/UFLD-L
(+) Line
Black
(-) Common
White
Ground
Green
Yoke Connector
Center Bolt
Mounting Block
Yoke Bracket
(2) 9/16" (15mm)
2" (51mm)
EATON
IB506004EN
Installation instructions
Fixture
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ufld-l

Tabla de contenido