Before initial use
7.2
Control panel
The control panel is at the air outlet unit of the roof air conditioner (fig. 2, page 3).
It contains the following control and display elements:
No.
Explanation
1
Knob
2
Knob
8
Before initial use
Inspection before starting up
Before you switch on the roof air conditioner, observe the following:
➤ Check whether the supply voltage and frequency correspond to the values
specified in the technical data, see page 21.
➤ Ensure both the air intake opening and the air nozzles are free. All ventilation
grilles must always be kept free to ensure that the roof air conditioner is able to
operate at maximum capacity.
!
CAUTION! Beware of injury
Do not insert your fingers or objects into the air nozzles or the intake
grille.
14
Switches the roof air conditioner on, off and selects
the fan speed
Selects the temperature
FreshJet
EN