Power Down Operation - Leggett & Platt Performance Serie Manual Del Usaurio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

To lower the base to the flat position during an electrical power outage, complete the following procedure:
STEP 1
Verify power is unplugged from electrical power source.
STEP 2
Locate (1) power brick (FIGURE 10) and (2) 9 volt batteries (not
included).
FIGURE 10
POWER
BRICK
STEP 3
Install (2) 9 volt batteries in power brick (FIGURE 11).
FIGURE 11
UNDERSIDE OF
POWER BRICK
14
Performance Models Scape/Scape+ Owners Manual 99301472-c

POWER DOWN OPERATION

INSTALL (2) 9 VOLT BATTERIES
*BATTERIES NOT INCLUDED
BATTERY
COMPARTMENT DOOR
(push down and slide off
to remove)

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Performance queenPerformance split cal-kingPerformance scape

Tabla de contenido